Ensuring Reliable Water Accountability From Jackwell to Aeration Unit
SBEM’s 151 MFM-B (Battery-Operated Electromagnetic Flow Meter)
WTP Inlet Line
Water Treatment Plant
Every Water Treatment Plant (WTP) relies on accurate measurement of raw water entering the treatment process. The inlet line, coming from the Jackwell, feeds water into the aeration unit where initial treatment begins.
Any mismatch between the raw water drawn and the treated water output can result in significant water loss, operational inefficiencies, and financial impact. Therefore, the plant needed a dependable way to measure actual raw water inflow at the inlet point to:
This inlet line was located in a remote area where external power was not available, making the measurement challenge even bigger.
The customer required a flow measurement solution that could:
SBEM installed the 151 MFM-B Battery-Operated Electromagnetic Flow Meter, designed specially for remote sites and continuous water monitoring.
The WTP team now gets reliable, real-time raw water consumption data directly from the inlet line. This allows them to:
Once again, SBEM proved to be “Your Measurement Partner”, delivering Reliable Beyond Measure solutions built with true Indianeering Excellence.