Introduction
On 5th June 2025, SBEM conducted a Courtesy Visit to a leading EPC partner’s water infrastructure project site in Bikaner, Rajasthan, where our 104 LOH (Loss of Head) and 104 ROF (Rate of Flow) instruments have been in operation since their commissioning on 15th May 2018.
This visit was carried out by the Customer Support Engineer of SBEM and attended by the Plant Manager and Site In-Charge of the leading EPC partner.
The primary purpose was to evaluate the performance and health of the instruments, which had been running successfully for over seven years, and to further strengthen the trusted relationship of SBEM with the leading EPC partner.


